Redwood Landfill - Office & Industrial

Location: 
Novato, California

The Redwood Landfill project included the construction of over a mile of paved access roads, new scale house and a trash drop-off area.

Adobe Associates, Inc. provided topographical mapping, roadway design, drainage analysis, permit processing, construction administration and construction staking.

From Weblog

April 23, 2012

Our land surveying crew spent a beautiful April day in Timbercove to scan a bluff and rock outcropping for our client.   The client owns several lots right on the bluff of the Pacific Ocean and there is a need to tie the development together and possibly create a path of travel through the rock outcroppings.  A 3D Scan was ordered.  3D scanning consists of taking color photos and incorporating them with survey grade data.

... Full post »

Our Clients Say

"I really enjoy working with Adobe. The Managers and Professionals are very thorough in their work, and they produce great reports and excellent graphics. I have found...
"I want to thank you for having someone like Tim at your firm.  He went way beyond the original scope of work which you were to provide and by doing so, he was able...