The Geyserville Fire Station project includes a new 12,500 sq. ft. state of the art headquarters that includes a two-story fire house with administrative, training and kitchen uses on the first level, living/sleeping quarters on the second level and a 5,300 sq. ft. apparatus bay that houses 6 to 8 fire trucks with adjacent operational support rooms. The 1-acre sloping site includes a 50 foot hose drying/training tower, secured staff parking and a future location for firefighter housing.
Adobe Associates, Inc. provided topographic mapping, site improvement design (utility, grading and drainage), drainage analysis, permit processing, construction administration and construction staking.